The New Hampshire Department of Environmental Services (NHDES), Dam Bureau is planning to host a public informational meeting on the ongoing evaluation of Merrymeeting Lake Dam, Jones Pond Dam and Alton Power Dam.
These three state-owned dams are currently being evaluated for hazard classification, discharge capacity and structural stability. This meeting is to review and discuss the results of these evaluations. This meeting is to take place on Tuesday, April 22, 2025, at 6:30 PM located at the New Durham Community Room 6 Main Street, New Durham, NH 03855.
NHDES anticipates having a separate meeting later this summer to discuss design recommendations based on these evaluations once those recommendations have been developed.
For more information, please contact Corey Clark, NHDES Dam Bureau at [email protected] or (603) 271-1961.
To attend by Zoom:
https://us02web.zoom.us/j/81848989487?pwd=RbFfXHjKTZiMdc4wlaNjhisBRRu0Sp.1 Meeting ID: 818 4898 9487

Pingback: kamagra en paris
Pingback: how to buy androxal uk where buy
Pingback: purchase enclomiphene canada over the counter
Pingback: purchase flexeril cyclobenzaprine uk no prescription
Pingback: is there a generic dutasteride avaliable in the usa
Pingback: ordering gabapentin price singapore
Pingback: buy cheap itraconazole generic brand
Pingback: ordering fildena canada no prescription
Pingback: buy cheap staxyn purchase online safely
Pingback: online order avodart price at walmart
Pingback: buy rifaximin in Australia
Pingback: order xifaxan buy sydney
Pingback: koupit obecný kamagra toronto